Sections

Weather Forecast

Close
Go back to: 

INVITATION TO BID PROJECT: Mayville State University, HPER Facility Replacement Project Mayville, North Dakota Bid Packages: #2 - Landscaping, Interior Demolition, Masonry, Rough Carpentry, Finish Carpentry, Metal Panels, Roofing, Joint Sealants, Doors / Frames and Hardware, Aluminum Framed Storefronts, Glazing, Gypsum Wallboard Systems, Ceramic Tile, Acoustical Ceilings, Wood Flooring, VCT, Sports Flooring, Carpet, Acoustical Wall Panels, Paint, Signage, Toilet Room Accessories, Fire Sprinkler Specialties, Lockers, Gymnasium Equipment, Fire Protection Systems, HVAC, Plumbing and Electrical BIDS CLOSE: Friday, June 13, 2014 - 2:00 PM CDT PROJECT #: 5100740 DATE OF ISSUE: May 23, 2014 BY: PCL Construction Services, Inc. 2200 Nicollet Avenue South Burnsville, MN 55337 Phone: (952) 882-9600 Fax: (952) 882-9900 OUTLINE OF PROJECT: Demolition of the 1929 gymnasium and building of a new 13,000 sf gymnasium, new offices, classrooms, restrooms and associated general space. The new gymnasium will be a pre-engineered metal building. TYPE OF BIDS: Separate bids will be received for the Bid Packages as listed above and described in Section 00 24 13 - Scopes of Work. CONSTRUCTION MANAGER: The Mayville State University (MaSU) - HPER Facility Replacement project will be constructed by multiple subcontractors; managed by PCL Construction Services, Inc. The contracts will be with PCL Construction Services, Inc. THE OWNER: Mayville State University 330 Third Street NE Mayville, ND 58257 BID LOCATION: PCL Construction Services, Inc. 12200 Nicollet Avenue South Burnsville, MN 55337 Attn: John Palmer www.jpalmer@pcl.com PRE-BID MEETING: Tues. June 3, 2014 9:00 AM CDT Civil/Demolition 10:30 AM CDT Plumbing, Mechanical, Electrical 1:00 PM CDT Architectural/Structural/Misc. East Entrance to the Lewy Lee Fieldhouse Mayville, ND 58257 Bids received after the designated time will not be accepted. It is the bidder's responsibility to see that mailed, faxed, emailed or delivered bids are in the hands of PCL Construction Services, Inc. prior to the time of the bid opening. OBTAINING DOCUMENTS: Drawings and Specifications may be examined at: 1.Fargo-Moorhead Builders Exchange 2.Grand Forks Builders Exchange 3.www.isqft.com 4.McGraw Hill Construction/Dodge 5.Reed Construction Data NORTH DAKOTA LAW: All bidders must be licensed for the full amount of their bids, as provided by North Dakota Century Code Section 43 07-05 and 43-07-12; and no bid will be read or considered which does not fully comply with the above provisions as to bond and licenses, and any deficient bid submitted will be re sealed and returned to the bidder immediately. THE CONSTRUCTION MANAGER & OWNER reserve the right to reject & hold any or all bids for 90 days after the date fixed for opening thereof. PCL Construction Services, Inc. is an affirmative action, equal opportunity employer.

randomness